Dunmore

Supply and Install Sydney Metro Only

  • 5.0m long x 4.0m wide ( 20m2 ) internally with an additional 1.1m deck on the front.

Supply and Install Sydney Metro Only

STANDARD INCLUSIONS (Stage 1)

Lock up stage only

  • Engineered and approved design.
  • All materials supplied, all licensed and insured tradesman.
  • Galvanized structural support posts concreted with 20mpa strength.
  • High tensile steel floor frame (10 years manufactures warranty).
  • Yellow tongue and groove flooring sheets.
  • T2 termite resistant wall and roof framing timber mgp10.
  • Galvanized steel bracing to comply with AS1684.2 – 2006
  • Ametalin silver sarking 97% reflective fire rated.
  • James hardie 300mm fire rated fibre cement weatherboard cladding.
  • Aluminum sliding windows with fly screen 1.200W x 1.200H x 2
  • Aluminum Sliding door 2.400W x 2.100H x1.
  • H3 F/J primed fascia board bullnose and DAR.
  • James hardie fibre cement eave sheets.
  • High performance foil backed roof insulation blanket.
  • Colorbond trimdeck roof sheeting, gutters, capping’s and downpipes.
  • H3 treated pine deck with 90mm smooth treated pine boards with galvanized screws.
  • All skip bins and rubbish removal included.
PREMIUM INCLUSIONS (STAGE 2)

Built to completion 

  • LED downlights x 6, double power points x 2, dimmable light switch x1.
  • Sub board with mandatory safety switches
  • Earthwool R2.0 90mm wall and ceiling insulation.
  • Smooth finished plasterboard 10mm to all walls and ceilings.
  • Plastered joints with 3 coats of plaster, sanded ready for paint.
  • Cove cornices 90mm sanded ready for paint.
  • 3inch skirting boards and architraves F/J primed pine.
  • Installation ONLY of internal floating floor boards (supplied by owner).
OPTIONAL UPGRADES

Supply and install additional costs.

 

  • Security sliding  ( diamond grill ) fly screen door for door unit.
  • External sensor light.
  • internal fan.
  • Hardwood decking boards ( Merbau ).
  • Fixed window skylight.
  • Daikin reverse cycle air conditioner.

EXCLUSIONS
  • Connection of main power supply from house.
  • Rainwater connection to stormwater pipe            (not required by council).
  • Supply and installation of balustrades.

Get a Quote For Your Project